国外某工程2×220MW火电厂EPC总承包合同


    某国外工程EPC合2
    APPENDIX 2 CONTRACT DATA SHEET
    附件2 合数表
    Name of Contract EPC Contract on XX2×220MW Thermal Power Plant
    合名称 XX2×220MW火电厂EPC总承包合
    Contract No合号:____________________________________
    Clause Ref
    参考条款
    Data

    GC1
    Owner业



    Contractor 总承包商







    Conciliator(s) 仲裁者
    Name


    GC1

    Time completion Plant for 电厂竣工时间
    Unit No1 36 (thirty six) months from effective date of Contract 1号机组:合生效日起36月
    Unit No2 and the whole Plant 42 (forty two) months from effective date of Contract
    2号机组整电厂:合生效日起42月


    GC4

    Contacts for Notice Purposes
    联系:
    YY
    Headquarters



    GC5
    The Governing Law 适法律
    Governing Law shall be the Law of the Socialist Republic of Vietnam The Contractor shall perform the Contract strictly in compliance with the Law of Vietnam Claims referring to Settlement of the Disputes (if any) arising during the Contract’s performance shall be governed by the laws issued and inuse in the Socialist Republic of Vietnam
    合适法律某国社会义国法律承包商应该严格遵循某国法律执行合果合执行工程中出现争执某国社会义国现行法律处置争执
    GC81
    Contractor shall commence work on the XXCoalfired Thermal Power Plant right after the Effective Date
    承包商应该合生效日起开始执行XX燃煤火电厂总包合
    The Contract shall enter into full force and become effective on the date when all of the following conditions have been fulfilled
    条件满足合全面生效:
    1) this Contract Agreement has been signed for and on behalf of YY and the Contractor
    YY集团承包商代表签署合协议
    2) The Bidder has submitted to YY the Performance Security and Advance Payment Guarantee
    投标商YY集团支付履约保函预付款保函
    3) The Bidder has received the Advance Payment from YY in accordance with relevant terms of the Contract
    投标商根合条款规定YY集团收预付款
    GC112
    The price shall be fixed 合总价固定
    GC133
    Amount of Performance Bond is 10 of Contract price 履约保函合总价格10
    GC2522

    Period during which the Guarantee Test should be conducted following commissioning first test before Reliability Run second and third test between start Reliability Run and within 3 months after PAC
    性实验调试进行:第次性运行前进行第二次第三次()性运行开始PAC三月期间


    GC262

    `
    Liquidated Damages for delay in Time for Completion of each Unit of XXPower Plant will be 120000USDday of delay for each unit from the guaranteed Date of Completion or from the date resulting from an Extension of Time for Completion granted in accordance with GC 39 up to a maximum of 10 of the contract price
    XX燃煤火电厂台机组部分果实际竣工时间延迟保证竣工期起开始计算者根GC39规定延长保证竣工期起开始计算违约赔偿金120000 USD天总违约赔偿金超合总价格10

    GC282 (b)

    Liquidated Damages payable upon failure to meet Performance Guarantees未达性担保求需支付违约赔偿金:
    The Contractor shall pay to YY for Liquidated Damages as stipulated in Appendix 8 of the Contract Agreement Liquidated Damages for failure to meet the Performance Guarantees shall be 20 of the Contract Value as maximum Total aggregate liability for all liquidated damages as stipulated in GC262 and GC282 in this contract shall not exceed 20 of contract price
    承包商YY集团支付违约赔偿金附录8(合协议)中规定性担保高违约赔偿金合总价格20合GC262 GC282范围类违约赔偿金累计金额超合总价格20











    APPENDIX 3 (GC) INSURANCE REQUIREMENTS
    附件3 (GC) –保险求

    Insurance to be taken out by the Contractor 承包商承担保险:

    In accordance with the provisions of GC34 the Contractor shall at its expense take out and maintain in effect or cause to be taken out and maintained in effect during the performance of the Contract the insurance set forth below in the sums and with the deductibles and other conditions as specified The identity of the insurers and the form of the policies shall be subject to the approval of YY The costs for insurance to be included in Bid price
    第GC34部分规定合履行期间承包商负责投保促成投保保持该保险效保险金额扣条款条件规定保险公司保险单形式均须获YY集团正式批准标价含保险费
    1 Construction and Erection Insurance施工安装保险
    The following insurance shall be taken out and maintained by the Contractor during the period of deliveryinstallation construction field testingcommissioningtrial operation at the Site of the Works covered under the Contract
    合规定承包商须现场工程交付安装施工现场测试调试试运行期间投保保持保险:

    (a) Erection All Risks Insurance to cover the entire Works (permanent andor temporary) from any and all kinds of damages which it is standard international practice for a contractor to insure under such a policy
    安装切险:范围含全部工程保险(永久时性工程保险)承包商保险单规定标准国际惯例投保损害保险

    (b) ThirdParty Liability Insurance to cover injury or death to persons or damages to property caused by the Works or by the Contractor's vehicles tools andor equipment or personnel
    第三方责险:范围包括工程施工承包商车辆工具设备工作员造成员伤亡财产损害

    (c) Workman's Compensation Insurance This type of insurance is required under Vietnamese Law to be secured by the Contractor for his employees The Contractor shall therefore faithfully comply with the requirements of said law 某国法律规定承包商须保证雇员提供职工赔偿保险承包商应实遵述法律求雇员投保职工赔偿保险

    (d) Automobile Liability Insurance机动车责保险:
    Covering use of all vehicles used by the Contractor or its Subcontractors (whether or not owned by them) in connection with the execution of the Works
    机动车责保险:范围包括承包商分包商执行施工机动车辆(述机动车辆否属承包商分包商)责保险

    The Contractor has the responsibility to ensure the insurances as mentioned above by the way to employ a trusty Insurance Company which is acceptable to YY These insurances will be effective to Final Acceptance Certificate issued by Owner specified in Contract Agreement
    承包商负责确保提供述保险投保守信YY集团接受保险公司述保险效期业发出合协议规定终验收证书日

    Before commencing the soil investigation works at site the Contractor shall submit the above Insurance Policies together with the official receipts evidencing premium payments
    现场进行土勘察工作前承包商应连正式收起提交述保险单证明已支付保险金

    Beneficiary for Erection All Risks shall be the Contractor within the Plant fence and YY out of the Plant fence Beneficiary for Third Party Liability Risk shall be YY
    安装切险受益电厂围墙承包商电厂围墙外YY集团第三者责险受益YY集团
    Deductibles limit for Erection All Risks
    安装切险免赔额限制:
    USD20000000 AOA for Loss or Damage due to Acts of God
    然灾害造成次事损失损害扣金额20000000美元
    USD20000000 AOA for Loss or Damage due to CommissioningTesting and Maintenance caused by Turbine
    汽轮机调试测试维修期间发生造成次事损失损害扣金额20000000美元
    USD10000000 AOA for Loss or Damage due to CommissioningTesting and Maintenance caused by other reasons
    USD10000000 AOA for Loss or Damage due to other causes (subject to be revised according to the confirmation of Insurance Policy)

    Deductible limit for Third Party Liabilities applicable for property damage USD500000 AOA
    适财产损害第三方责险免赔额限制:次事500000美元
    Deductible limit for Third Party Liabilities applicable for personal injury Nil
    适员伤害险第三方责险免赔额限制:零美元

    Before PAC the Owner shall bear the deductibles for the loss andor damage which is caused by reason of the Owner (including his employee and consultant) If the loss andor damage is caused by any third party the Contractor shall bear the deductibles for the loss andor damage which cannot be claimed from the insurer The Contractor shall bear the deductibles for the loss andor damage which is caused by other reason (excluding Force Majeure)From PAC to FAC the Contractor shall bear the deductibles for the loss andor damage which is caused by the Contractor YY shall bear the deductibles for the loss andor damage which is caused by other reasons
    时验收前业须承担(包括业雇员顾问员)造成损失损害免赔额述损失损害第三方造成承包商须承担造成损失损害免赔额(该部分保险金保险公司赔付)承包商须承担原(含抗力素)造成损失损害免赔额时验收终验收期间承包商须承担造成损失损害免赔额原造成损失损害免赔额YY集团承担

    The Contractor shall indemnify YY against all actions suits claims demands cost or expenses arising from or in connection with any accident illness or death (other than such as may be attributable to YY its agents or servants) to persons employed by the Contractor or his Subcontractor at Site
    承包商应确保业免承包商分包商现场员事疾病死亡引起事疾病死亡关(YY集团代理商雇员引起)诉讼讼案索赔求成费
    The Contractor shall indemnify YY against all loss andor damage arising from its improper design for the Works
    承包商须工程设计YY集团造成损失损害提供赔偿
    The Contractor shall initiate and successfully obtain security payments covering losses andor damages arising out of the Contract Failure to initiate or settle the claim within a reasonable period of time shall constitute sufficient grounds for YY to exercise its rights under the Contract Should the Contractor fail or refuse to maintain its insurance above YY will secure renew or maintain said insurance and any and all expenses incurred thereby shall be deducted from any and all sums due or may become due to the Contractor The Performance Bond submitted by the Contractor shall also be used where necessary to cover such expenses
    承包商应发起获损失损害赔偿金承包商未合理期限开始解决该索赔YY集团足够理履行合赋予权利承包商未拒绝进行述投保YY集团提供续保保持述保险效招致全部费期付款中扣根需承包商提交履行保函中扣述费
    2 All Risk Insurance for Transportation of Equipment and Materials设备材料运输切险保险
    Without prejudice to the Contractor's obligations and responsibilities under the Contract the Contractor shall insure the equipment and materials to be supplied and delivered with a reputable insurance company acceptable to YY The insurance shall be taken out in the joint names of the Contractor and YY for their respective rights and interests and shall cover all Risks including sea and land transport and war risk from place of origin to the Site
    合项规定承包商义务责相突情况承包商应提供交付设备材料投保切险保险承包商应投保信YY集团接受保险公司承包商YY集团合权利利益联名投保切险范围原产工程现场间运输保险包括海运险陆运险战争险

    The insurance coverage shall be one hundred and ten percent (110) of the delivered cost and insurance premiums shall be paid by the Contractor Under such insurance the indemnity must be payable in US dollars freely usable to replace or repair such goods The Contractor acting as agent for YY shall initiate proper action and pursue settlement regarding insurance claims whenever damages andor losses are inflicted on the goods The Contractor shall be authorized to receive the indemnity directly from the insurance companies
    unless otherwise directed by YY
    保额交付材料货物价值百分十(110)保费承包商支付保险单规定保险赔付必须采美元支付应够更换修复保险赔付部分货物作YY集团代理货物出现损害损失时承包商应采取适行动办法处理关保险索赔YY集团指示外承包商应获授权便直接接受保险公司赔付

    YY shall be named as coinsured under all insurance policies taken out by the Contractor pursuant to GC 341 except for Workman’s Compensationand the Contractor's Subcontractors shall be named as coinsureds under all insurance policies taken out by the Contractor pursuant to GC 341 except for the Cargo Insurance During Transport Workman's Compensation and all insurer's rights of subrogation against such coinsureds for losses or claims arising out of the performance of the Contract shall be waived under such policies
    YY集团应承包商第GC 341部分规定投保保险保险工赔偿险承包商分包商应承包商第GC 341部分规定投保保险保险货物运输险工赔偿险该保险单项承保应放弃保险代位求偿权

    The Contractor shall as soon as practicable but not later than one (1) month prior to the first scheduled shipment furnish a copy of the Insurance Policy to YY
    承包商应快迟第批货物装运前(1)月保险单复印件提交YY集团

    The Contractor shall be responsible for any loss andor damage of the goods shipped without the specified insurance coverage
    承包商须承担保险规定范围外运输货物损失损害












    附件4 进度节点


    附件5 分包商清单


    附件6 Power of Attorney


    授权书

    APPENDIX 7 LIST OF DOCUMENTS FOR APPROVAL OR REVIEW BY xxx
    附录7 – 提交xxx集团批准审核文件清单
    Pursuant to GC2031 the Contractor shall prepare and present to the Project Manager in accordance with the requirements of GC182 (Program of Performance) the following documents for
    条款GC2031规定承包商应根条款GC182(执行计划)准备项目理提交列文件:


    Number of Week from Effective date of Contract
    合生效日起需周数
    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成
    General总



    List of Civil and Architecture drawings and time for submission土建图纸提交时间清单
    A
    6 weeks
    is updated monthly but not later than 9 months
    月更新迟9月

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    List of Technological drawings and time for submission技术图纸提交时间清单
    A
    8 weeks
    is updated monthly
    月更新
    List of completion documents and time for submission完工文件提交时间清单
    A
    6
    is updated monthly
    月更新
    KKS system电厂标识系统(KKS)
    A
    4
    12
    Progress report进度报告
    R

    Monthly月更新
    Program and Procedure of quality Control质量控制计划质量控制程序
    A
    4
    24
    Final list of SubcontractorsManufacturers分包商制造商终清单
    A
    8
    24
    Testing and Inspection program (testing at manufacturers workshop) 试验检验计划(制造商工厂试验)
    A
    8
    16
    Detailed program for commissioningacceptance
    调试验收详细计划
    A
    48
    3 months before start of commissioningacceptance开始调试验收前3月
    Detailed program for Reliability Run
    A
    48
    3 months before start of Reliability Run

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    性运行详细计划


    开始性运行前3月
    Testing documentall testing result reports
    试验文件试验结果报告
    A
    4 weeks after testing
    试验4星期
    6 months before trial run试运行前6月
    Training program培训计划
    A
    8
    6 months before start of commissioningacceptance开始调试验收前6月
    As build documents (drawings for all equipment)
    竣工文件 (设备图纸)
    A

    3 months after PAC时移交(PAC)3月
    Declaration of complying with Vietnam Regulations
    遵守某国法律申明
    A

    Latest at start of commissioningacceptance开始调试验收前时间
    List of spare part
    备品备件清单
    A
    36
    2 months before PAC
    发放时验收证书(PAC)前2月
    Implementation Progress
    实施进度



    Overall time schedule for engineering manufacturing procurement supply transportation e
    A
    4
    Monthly月更新

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    rection and commissioning detailed for all system and main parts of the power plant civil works and specified time for startfinish and relationship for each task
    设计制造采购供货运输安装调试总体进度表电厂系统部分土建详细进度表开工完工具体时间表务间关系



    Detailed schedule for construction erection and commission施工安装试车详细时间进度表
    A
    4
    2 months before construction erectioncommission施工安装试车前2月
    Design drawings
    Design mechanical & thermal part
    机械热力部件设计



    Final heat balance Report
    终热衡图
    A
    Submit in Bid proposal document 投标文件中提交
    8

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    Drawing for piping arrangement 道布置图
    A
    4
    12
    Technological diagram(with P & I diagram) 技术图纸(工艺道仪表流程图)
    A
    4
    12
    Heat calculation for cooling water system
    冷水系统热量计算书
    A
    4
    12
    Design electrical part
    电气设计



    Single line diagram 单线图
    A
    4
    12
    Standard circuits for electrical consumers
    电气设备标准电路
    A
    6
    12
    Concept of EMC with overvoltage protection电压保护电磁兼容性概念设计
    A
    6
    12
    Generatorunit block protection diagram 发电机发电机组保护线路图
    A
    4
    12
    List of equipment motors machines and consumers
    装置马达机器电设备清单
    A
    6
    30

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    Earthing system and calculation
    接系统计算
    A
    8
    12
    Arrangement of circuit breakers and battery room auxiliary transformers and cabling etc
    电路断路器电池室辅助变压器电缆敷设等布局
    A
    6
    12
    Unit protection and measurement diagram
    动力机组保护测量图
    A
    6
    12
    Generator operation diagram (circuit diagram)
    发电机运行图(电路图)
    A
    Will be submitted in Bid Document投标文件中提交
    4
    Lightning protection diagram with earthing measurement location and measurement report in commissioning period
    雷电保护线路图附带调试期间接测量位置测量报告
    A
    4
    8
    · C&I design
    · C&I 设计
    P & I diagram (enclosed with system cycle)
    A
    6
    24

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    工艺道仪表流程图((附系统周期)



    Control system structure including detail components and standby equipment
    控制系统结构包括详细部件备设备
    A
    4
    24
    Earthing design接设计
    A
    6
    8
    Explosion protection design
    防爆设计
    A
    6
    20
    Layout of CCB with detail arrangement of tables and panel (3 dimensions)
    中央控制室(CCB)面布置图操作台控制屏详细布置(三维??)
    A
    4
    20
    Civil part design土建部分设计



    General Plant Layout consisting of buildings out door systems road established on the base on topography investigation at site
    电厂总布置图包括建筑户外系统道路等根工程现场调查形进行确定
    A
    4
    12

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    Drawings for all buildings arrangement and architecture included perspective of power plant and sections (scale 1100)
    建筑物布局建筑结构图纸包括火电厂透视图剖面图(例尺1100)
    A
    4
    12
    Load diagram荷载图
    A
    4
    12
    Architecture perspective (all side) for all buildingshouses of the power plant
    电厂建筑物房屋(侧面)建筑透视图
    A
    4
    12
    Arrangement drawings for out side systems included roads sewers gates basins foundations etc
    户外系统布置图包括道路水道门水池基础等
    A
    4
    12
    Design drawing for construction 施工设计图纸
    Design for mechanical and thermal part
    机械热力部件设计



    System drawings branch piping including list of pipes and valves with the descriptions of material diameter and rated pressure dimension insulation thickness of all pipes
    A
    18
    30

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    Isometric Drawings (3 dimensional with pipe length) are included
    系统图纸道分支图纸包括道阀门清单(含道材料直径额定压力尺寸绝缘厚度描述)包含等容积图纸(道长度三维图)



    Main piping diagram including cable route locations
    道系统图包括电缆线路位置
    A
    18
    32
    Characteristics of pumps fans etc
    泵类风机等特性
    A
    18
    24
    Design calculation for pumps heat insulation piping etc
    泵类热绝缘装置道系统等设计计算
    A
    18
    30
    Electrical design电气设计



    Cable list电缆清单
    A
    18
    36
    Circuit diagram of each electrical equipment
    R
    18
    24

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    台电气设备电路图



    AVR diagram of generator
    发电机动电压调节(AVR )图
    A
    8
    10
    Circuit diagram of fire alarm system火警系统电路图
    A
    12
    32
    Arrangement diagram with accuracy location of fire alarm equipment (if applied) 火警精确布置图(果)
    A
    18
    32
    Electrical small power and lighting system电气明系统
    A
    18
    30
    Cable tray arrangement and cable load diagram
    电缆桥架布置图电缆敷设图
    A
    18
    32
    Dimension and installation diagram of generator transformer circuit breakers etc
    发电机变压器电路断路器等尺寸图安装图
    A
    18
    32
    Dimension diagram of auxiliary equipment of generator
    发电机辅助设备尺寸图
    A
    18
    32
    Dimension diagram of switch cubicle terminal
    A
    18
    32

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    box of generator voltage regulation cubicle excitation cubicle generator circuit breaker including equipment configuration
    开关柜发电机接线盒电压调节柜励磁室发电机电路断路器尺寸图包括设备配置



    Calculation of shortcircuit current and determination of relay setting mode for generator protection and auxiliary power supply in the view of system protection根系统保护求计算短路电流确定发电机保护备供电设备继电器设置模式
    A
    18
    40
    C&I design C&I 设计
    Layout of rooms with cubicle and supporting structure arrangement
    控制室布局包括控制柜支撑结构布置
    A
    16
    30
    Description of functional control functional scheme (including machine language and according to ISA standard) 功控制功配置描述(包括机器语言符合国际标准协会(
    A
    20
    32

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    ISA)标准)



    DCSPLC interface document IO distribution
    分散控制系统(DCS)编程控制器(PLC)接口文件输出输出分配
    A
    20
    32
    External connection diagram terminal connection diagram circuit diagram and combining scheme
    外部接线图端子接线图电路图组合图
    A
    20
    32
    Communication system通信系统
    A
    18
    36
    Complete setting software for DCS PLC or other system
    分散控制系统(DCS)编程控制器(PLC)系统整设置软件
    A

    One month after temporary takingover
    时移交1月
    Tool list专工具清单
    A
    18
    36
    Cabling diagram电缆敷设图
    A
    18
    36
    · Civil design 土建设计
    Foundation detail drawings for buildings and structure (Auxiliary Electrical equipment turbine boiler and stack foundation etc) 建筑物结构基础
    A
    6
    10

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    详细图 (辅助设施电气装置汽机锅炉烟囱基础等)



    Structural detail drawings for all buildings and structures (concrete and steel structures) 建筑物结构(混凝土钢结构)结构详细图
    A
    8
    12
    Architectural detail drawing建筑详细图
    A
    8
    12
    Document of houses including external works and finishing work window doors cleaning painting roof floor etc) 房屋设计文件包括外部工程收尾工程窗户门清洁油漆屋顶板等)
    A
    12
    32
    Detail drawings of internal works (HVAC system water drainage lighting) 部工程详细图(采暖通风空调系统(HVAC)水污水排泄明)
    A
    12
    32
    Detail drawings of connection parts hooks bracing connection accessories etc
    连接部分吊钩支柱连接附件等详细图
    A
    4
    8

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    Detail drawings for outdoor system and service system (water drainage system drainage pits water water piping channels underground piping cable route etc)
    户外系统服务系统详细图(排水系统排水沟水水沟渠道电缆线路等)
    A
    12
    32
    Detail drawings for roads including access way walkway fencedoor landscape etc 道路详细图包括进厂道路行道围墙门绿化等
    A
    12
    24
    Detail description of building construction structure design (structural system foundation etc) 建筑结构详细描述结构设计(结构系统基等)
    A
    6
    16
    Roof diagram elevation and cross section 屋顶示意图立体图剖面图
    A
    12
    37
    Structural drawings for discharge channel and water supply method 排水结构图供水方法
    A
    6
    10
    · Application document for license 申请许证文件

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    Documents for operation permission施工许文件
    A
    6
    30
    Documents for other permissions 许需文件
    A
    6
    30
    · Other documents 文件
    Test schedule at manufacturers
    制造厂家检验计划表
    A
    4
    One month before test
    检验前1月
    Quality Control Methods
    质量控制方法
    A
    6
    12
    Instruction Manual for applied regulations and standards
    采规定标准说明手册
    A
    4
    12 months
    12月
    English version of applied Chinese standards
    采中国标准英文版
    A
    8
    Will be submitted with cover letter for approval by YY
    连介绍信起提交YY集团批准
    Operation Instruction Manuals including
    Operation process and instructions of power plant operation including descriptions of all system process and functional group
    A
    3 months after commissioning 调试3月
    Before temporary takingover 时移交前

    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    Asbuilt documents
    Description of general and separate control
    Description of signal processing and power plant and equipment protection with alarm and trip setting
    Operation conditions including connection and power supply to power network
    Load diagram for lifting works (repair maintenance etc)
    操作说明手册包括:
    电厂操作程序说明包括系统程序功组描述
    竣工文件
    总体单体控制描述概念
    信号处理带报警跳闸设置电厂设备保护描述
    操作条件包括电网接线电源
    (修理维护等)起重作业荷载图



    Startup and stop diagram of condition including description (cold warm hot)
    启停机曲线图描述(包括冷
    A
    Will be submitted in Bid document连投标文件起提交
    8 weeks before starting commissioning
    开始调试前8周


    Document文件名
    Purpose目
    Preliminary (weeks) 初步(周数)
    Completion
    (weeks) 完成

    Number of Week from Effective date of Contract
    合生效日起需周数
    态暖态热态启动停止)



    · Maintenance Instruction Manual 维护指导手册
    Maintenance process and guiding system with description of all types of equipment and machine
    维护程序指导种类型设备机器描述
    A
    3 months before commissioning调试前3月
    Finish reliable run start operation of Unit 1
    1号机组性运行完成开始运营
    A For Approval
    A 请求批准
    R For Revision
    R 请求修改
    All drawings will be submitted in electronic file (pdf) and hard copy with the quantity in accordance with the Contract requirement
    图纸应采电子文档(PDF格式)硬拷贝形式提交提交图纸数量应符合合求

    Beside the content stipulated above the Contractor has to totally follow and comply with Vietnamese regulations and law For this reason additional drawings and documents may be submitted for approval
    述规定容外承包商必须完全遵循某国规章法律需提交外图纸文件获批准

    The submission time will be further discussed during kickoff meeting
    提交时间启动会予进步讨



    APPENDIX 8 PERFORMANCE GUARANTEES
    附件8——性保证

    WWW Consortium shall undertake to guarantee the performance parameters specified in the following schedules based on the following reference conditions
    WWW承诺列条件担保表中性参数:

    Ambient Conditions 外界条件
    1 Average air temperature 29°C
    均气温度
    2 Barometric pressure 10kgcm2
    气压力
    3 Relative humidity 86
    相湿度
    4 Circulating water temperature at inlet of condenser 30 0C
    冷凝器入口循环水温度

    Coal Specifications 煤炭特性
    Coal specifications are stated as in the Bidding Documents and Owner’s clarification Letter No1 dated 22nd August 2008
    煤炭特性招标文件业2008年8月22号NO1澄清函中已规定

    TABLE OF GUARANTEED PERFORMANCE PARAMETERS
    性担保参数表
    No
    Guaranteed Performance Parameters of
    xxx Thermal Power Plant
    xx火电厂性保证参数表
    Unit
    单位
    Unit Load 负荷
    100
    75
    1
    Guaranteed Net Output 净输出保证
    MW


    · Guaranteed Net Output of unit 1
    1号机组保证净输出功率
    MW
    208442
    156293
    · Guaranteed Net Output of unit 2
    2号机组保证净输出功率
    MW
    208442
    156293
    · Guaranteed Net Output of the plant
    · 电厂保证净输出功率
    MW
    416884
    312586
    2
    Guaranteed Net Heat Rate (Based on low heating value)
    保证净热耗率(基热值)
    KcalkWh


    · Guaranteed Net Heat Rate of unit 1
    1号机组保证耗热率
    KcalkWh
    2359
    2435
    · Guaranteed Net Heat Rate of unit 2
    2号机组保证耗热率
    KcalkWh
    2359
    2435
    · Guaranteed Net Heat Rate of the plant
    电厂保证耗热率
    KcalkWh
    2359
    2435

    3
    Stack emissions (for all kinds of coal and in all operation conditions)
    烟囱排放求(种煤炭运行条件):

    § Bidder shall undertake to comply with the following Vietnamese Standard TCVN 74402005 on the following emission limits
    § 投标商应保证遵循TCVN7440-2005号某国标准烟气排放求

    § Sulfur dioxides (SO2) £ 472 mgm3
    § Nitrogen oxides (NOx) £ 315 mgm3
    § Dusts £ 118 mgm3
    § 二氧化硫(SO2): £ 472 mgm3
    § 氮氧化物(NOx): £ 315 mgm3
    § 颗粒: £ 118 mgm3
    (Standard conditions are 250C and 1013kPa) (标准条件气温250C气压1013kPa)






    mgm3
    mgm3
    Mgm3






    472
    315
    118
    4
    Limestone consumption 石灰石耗量
    for operation at 100 rated output and achieving of SO2 emission limits as specified in point 3 of this Table (By reference coal and limestone specifications stipulated in Bidding Documents)
    电厂100额定功率确保满足表第3条规定SO2排放求时石灰石量(标书煤炭石灰石特性规定基础进行计算
    th
    2×1161





    Boiler 1
    1号锅炉
    th
    1161
    Boiler 2
    2号锅炉
    th
    1161
    5
    Time of completion 竣工时间


    Unit 1
    1号机组
    Months 月
    36
    Unit 2 and the whole plant
    2号机组整电厂
    Months月
    42

    Remarks 备注
    1 The performance test at 100 Rated Output shall be done by the Contractor and witnessed by the OwnerConsultant
    性实验100额定功率进行业顾问见证

    2 The Contractor shall submit to the Owner for approval the comprehensive test procedures programs at least three (3) months prior to the start of the actual tests of equipment andor plant
    承包商需少电厂某部分性实验前3月提交实验程序计划业批准



    APPENDIX 10 LIST OF SPARE PARTS OFFERED BY CONTRACTOR
    Following the list of spare parts offered for the equipment to be supplied under the Contract
    Item No
    Description
    Quantity per Item
    Remark
    Essential Spare Parts ( Civil and Architectural)
    I
    Essential Spares Parts


    1
    Seal components of pump
    1

    2
    Temporary Aircraft Warning Light
    2

    3
    Interior Lighting
    5

    4
    Ventilation systems(grills diffusers filters flexible ducts dampers)
    5

    5
    Small Power (36V)
    2


    Consumables ( Civil and Architectural)
    1
    Lubricating oil
    2

    2
    Lubricating grease
    2

    3
    Glass thickness 3÷5mm
    200m2

    4
    Some auxiliaries used in the door and window
    500 sets

    5
    Incandescent Light
    1000 pieces

    6
    Fluorescent lamp
    500 pieces


    Essential Maintenance Tools and Appliances ( Civil and Architectural)
    1
    Adjustable spanner
    5

    2
    Electric drill
    2

    3
    Electric hammer
    2


    Item No
    Description
    Quantity per Item
    Remark
    4
    Portable cutting machine
    2


    Essential Spare Parts ( Turbine and Subsidiary)
    I1
    Turbine Essential Spare Parts


    1
    Turbine
     

    11
    each type and size of studs nuts and washers used in HP and IP turbine outer and inner casing
    1

    12
    sealing glands and interstage labyrinths
    1

    13
    thrust bearing wearing parts (disc ring thrust shoes)
    1

    14
    spindle for turbine main governing valve and reheat governing valve
    1

    15
    studs nuts washers gaskets oil seals bushing for turbine main valves (main stop governing reheat stop intercept LP bypass)
    1

    16
    special gaskets
    2

    17
    adequate spares of regulating system parts more subject to wear such as pins rolling bearings
    1

    18
    low pressure casing rupture disc
    1

    19
    a variety of specifications of the oil seal
    1

    110
    Steam trap of each type furnished
    2

    111
    Thread and joint compound used in turbine erection
    1

    112
    Gland packing mechanical seals oil seals and gaskets for lubricating oil system
    1

    113
    Bearings for each type of oil pump and motor
    2

    114
    Thermometers pressure gages and pressure switches for regulating and lubricating oil
    2

    2
    Condenser
     

    21
    5 of all condenser tubes
     

    22
    condenser water level gauge glass and packings both for hotwell and water boxes
    1

    23
    gaskets for all connections to condenser shell
    1

    24
    gaskets for all manhole access doors to shell and water boxes
    2


    Item No
    Description
    Quantity per Item
    Remark
    25
    gaskets for water boxcondenser One (1) float operated automatic vent valve
    1

    26
    Float operated automatic vent valve
    1

    27
    Tube plugs of number equivalent to 10 of the total number of condenser tubes
    10

    3
    Condensate Pumps
     

    31
    of all bearings for pump and motor
    1

    32
    wear rings bushings and packing
    1

    33
    strainer element
    1

    34
    Shaft bush
    4set

    4
    Cooling water pumps
     

    41
    journal and thrust bearing wearing parts of pump and motor
    1

    42
    gaskets wear rings sleeves seals bushing etc for pump
    2

    43
    Cooling water Piping Valves and Expansion Joints
     

    44
    isolating valves mounted in cooling water piping
    1

    45
    control devices for cooling water valves
    1

    46
    Motor bearings
    2

    47
    Pumb bearings
    2

    48
    Shaft bush
    2

    5
    Condenser Tube Cleaning System
     

    51
    50 of each type of sponge ball
    50

    6
    Cooling water Chlorination System
     

    61
    One (1) evaporator immersion heater
    1

    62
    One (1) pressurevacuum relief valve
    1

    63
    One (1) pressure regulating valve
    1

    64
    One (1) vacuum regulating valve
    1

    65
    10 of each type size pressure rating valve
    10

    67
    Bearings for pumps and motors
    1

    68
    Wearing rings and bushes for pumps
    2

    69
    Packing and special gaskets for pumps
    2

    610
    filter
    1

    611
    Chlorine contact gauge for highlow alarm
    2

    612
    Pressure switches with chemical seal for expansion tank
    2


    Item No
    Description
    Quantity per Item
    Remark
    613
    Diaphragms for instrument seal
    1

    614
    Valve springs gaskets and diaphragm assembly of safety shut off valves
    2

    615
    Each of water level gauge glass water bath level control switch thermostatic water temperature controller water temperature switches (high & low) for evaporator
    1 each

    7
    CCW Pumps
     

    71
    One (1) set of bearings for pump and motor
    2

    72
    One (1) set of sealing rings and Shaft bushes
    2

    73
    Two (2) sets of packing and gaskets for pump
    2

    74
    Sealing Oringspaper gasket
    2

    75
    Stuffing ring
    8

    8
    ACW Pumps
     

    81
    One (1) set of bearings for pump and motor
    2

    82
    One (1) set of sealing rings and shaft bushes
    2

    83
    Two (2) sets of packing and gaskets for pump
    2

    84
    Sealing Oringspaper gasket
    2

    9
    CCWACW Coolers
     

    91
    5 of the cooling tubes (or plate of equivalent quantity
     

    92
    Tube plugs of number equivalent to 10 of the total number of tubes
     

    93
    Two (2) sets gaskets for the manholes and water boxes
    2

    94
    Two (2) sets of special gaskets for cooler
    2

    95
    One (1) valve of each type and size
    1

    96
    Two (2) sets of renewable parts of valves for each type and size
    2

    97
    20 of sight flow indicator installed
     

    98
    One (1) set of filter basket for each type
    1

    10
    LP and HP Heater
     

    101
    level gauge for each type installed on heaters and two (2) sets of glasses and packing for each type of gauge
    6

    102
    Tube plugs of number equivalent to 10 of the total number of tubes
    2072

    103
    100 gaskets for the water box end cover manholes of each HP LP heater and deaerator
    10


    Item No
    Description
    Quantity per Item
    Remark
    104
    valves ( diameter less than 50mm )
    2

    105
    Valve(50 mm diameter or greater)
    1

    106
    renewable items (discs spindles bushings) for each type of valve fitted
    2

    107
    For feedwater heater bypass renewable parts (discs spindles bushing seal rings etc) for each type one (1) set of packing for each size three (3) sets of special gaskets for each size
    1

    108
    valves for feedwater pump recirculation control
    2

    109
    Water level meter
    5set

    1010
    Pressure gauge
    5set

    1011
    Thermometter
    5set

    1012
    Instrument primary valve
    5set

    1013
    Pressure gauge primary valve
    5set

    11
    Boiler Feed Pumps and Booster Pumps
     

    111
    special gaskets to be used in overhauling the pumps
    3

    112
    pump items subject to major wear (balancing discs and rings shaft protecting sleeves etc
    2

    113
    journal and thrust bearing wearing parts for each type of pump and motor
    2

    114
    Adequate stock of packing
     

    115
    Forepump mechanical seal
    2set

    116
    MiscSpec Orings of forepump
    2set

    117
    Misc Spec Orings of feedwater pump
    2set

    118
    Bearing bush
    1set

    119
    Thrust tile
    16set

    1110
    Jacketed gasket
    1set

    1111
    Balance drum
    1set

    1112
    Electric feedwater pump mechanical seal
    1set

    12
    Condensate Storage System
     

    121
    One (1) set of bearings for pump and motor
    1

    122
    One (1) set of wearing rings and bushings
    1

    13
    Water Treatment Plant
     

    131
    bearing seals rings wear parts and gasket for each pump supplied
    1


    Item No
    Description
    Quantity per Item
    Remark
    132
    gauge glass packing for each type
    2

    133
    all fittings and equipment necessary for maintenance and repair of pumps motors and air blowers To include seals gears filters etc
    1

    134
    ejector
    1

    135
    resin
    50

    136
    pipes installed
    5

    137
    valve of each type and size installed
    1

    138
    Spare parts for chemical pumps as directed by the manufacturer
    1

    14
    Waste Water Treatment Plant
     

    141
    seals rings bearing diaphragm packing for each pump
    1

    142
    bearing lock washer oil gauge vbelt for blowers
    1

    143
    bearing Oring oil seal for each agitator
    1

    15
    Lifting Equipment and Cranes
     

    151
    flexible disc or coupling bolts
    1

    152
    oil seals of gearboxes
    1

    153
    bearings for each type used
    1

    154
    actuating springs
    1

    155
    linings or linings bonded to shoes
    2

    16
    Compressed Air System
     

    161
    sealing glands spring and diaphragms
    4

    162
    bearings oil seals for each compressor and motor
    1

    163
    filter pads
    1set

    164
    piston rings of each compressor
    20

    165
    spare parts for air dryer
    2

    166
    pressure gauges pressure switches trap and any other parts subjected to wear as directed by the manufacturer
    1

    17
    Cooling tower Essential Spare Parts


    171
    Universal try square
    1pcs

    172
    Nozzle NS type
    200set

    173
    Filter plate dual ladder wave
    150sheet

    174
    Water receptor plate reinforced arc
    150sheet

    18
    Deaerator Essential Spare Parts



    Item No
    Description
    Quantity per Item
    Remark
    181
    Manhole gasket
    4set


    Essential Maintenance Tools and Appliances ( Turbine and Subsidiary)
    1
    Turbine
     

    11
    lifting gear and slings
    1

    12
    guide pillar
    2

    13
    wrench for rotor
    1

    14
    rotor lifting tools for beating overhaul
    1

    15
    bolt extension measuring equipment
    1

    16
    spanners and wrenches
    1

    17
    bridge gauges
    1

    18
    rotor supporting device
    1
    Included and delivered
    together with equipment

    19
    HPOP casing bolt tightening equipment
    1
    110
    HPIP casing bolt tightening equipment
    1
    111
    dial gauge & rod for rotor alignment
    1
    112
    axial clearance gauge
    1
    113
    MSV overhaul tool
    1
    114
    GV overhaul tool
    1
    115
    rotor balance measuring equipment
    1
    2
    Condenser
     

    21
    tube expander of hand operated type
    1

    22
    tube knocking tool
    1

    3
    Feedwater Heating System
     

    31
    tube expander of hand operated type
    1

    32
    tube knocking tool
    1





    Item No
    Description
    Quantity per Item
    Remark
    Essential Spare Parts ( Boiler and Auxiliaries)
    1
    Boiler and Auxiliaries
     

    11
    All of water tubes and membrane bar
    2

    12
    All of economiser tubes
    5

    13
    All of superheater tubes
    5

    14
    All of reheater tubes
    5

    15
    All of bends for superheater reheater and economiser tubes except unheated section
    10

    16
    gaskets for drum manholes
    50

    17
    Safety valves at least 50 of valve discs spindles guides one (1) set of adjusting rings and pins for each type and size of safety valve
     

    18
    Power operated safety valve one (1) main disc one (1) pilot disc one (1) main disc guide one (1) pilot valve steam guide one (1) pressure element
     

    19
    Highpressure valves two (2) sets of packing seal ring andor gaskets for each type and size of valve
     

    110
    Highpressure check valves one (1) disc for each type and size two (2) sets for seal rings andor gaskets for each type and size
     

    111
    Boiler continuous blowdown valves 100 of valves fitted
     

    112
    Two (2) complete valves for each type of minor valve for the following services
     

    113
    Drum and boiler vents pressure and level gauges header vent and drains water and steam sampling steam traps etc
     

    114
    valves of each type and size
    2

    1151
    sets of packing rings and special gaskets for each type and size of valve
    3

    1152
    Two (2) sets of each type and size of steam traps for moderate pressure and temperatures one (1) for each type and size of steam traps subjected to high pressure and temperature and adequate stock of filters wearing pacts and gaskets
     


    Item No
    Description
    Quantity per Item
    Remark
    1153
    complete set of spare parts for each type of level gauge
    1

    1154
    access door with frame
    1

    1155
    inspection opening with frame
    1

    116
    Boiler circulating pump and motor assembly
     

     
    bearing of each type
    1
    Not supplied Contractor will deduct 28676 USD from Contrat value
     
    shaft seal
    1
     
    complete rotor
    1
     
    wearing rings
    1
     
    gaskets and packing
    1
    117
    Soot Blowers
     

     
    nozzles for each type
    6

     
    steam admission valve assembly of each type
    2

     
    valve steam assembly of each type
    15

     
    rotary chain with connector and tightener of each type
    3

     
    retracting chain with connector and tightener of each type
    3

     
    retracting gear boxes with coupling of each type
    2

     
    gland packing oil seals and gaskets for steam valves of each type
    3

    118
    Fuel Firing System
     

    1181
    Coal Feeders
     

     
    Conveyor
    1

     
    Bearing
    1

    1182
    Coal Crushers
     


    Item No
    Description
    Quantity per Item
    Remark
     
    Bearing
    1

     
    speed reducer
    1
    If machine is not equipped with this it will be replaced by other necessary spare parts with equivalent value
     
    lubricating pump and motor
    1

    1183
    Heavy Fuel Oil Pumps and Accessories
     

     
    sealing ring
    2

     
    Bearing
    2

     
    bushing wearing rings packing and gaskets
    2

     
    filterstrainer
    2

     
    relief valve
    1

     
    packing rings and special gaskets for each type and size of valve
    2

    1184
    Fuel Oil Heaters
     

     
    tube plugs equivalent to 10 of tubes installed
    10

     
    packing rings and special gaskets for each type and size of valve
    2

    1185
    Oil Burners and Accessories
     

     
    oil burner for each type oil and igniter
    1

     
    nozzles for each type oil and igniter
    10

     
    valve of each type and size
    1


    Item No
    Description
    Quantity per Item
    Remark
     
    flexible hoses for each type oil and igniter
    8

     
    flexible hoses for steam
    8

     
    burner retraction device
    1

     
    flame detectors
    2

     
    burner shut off valves with actuator for each type and size
     

    1186
    Igniter Oil Pumps
     

     
    Bearing
    1

     
    shaft sealing
    1

     
    bushing wearing ring gaskets and packing
    2

     
    suction strainer basket
    1

     
    relief valve
    1

    2
    Draft System
     

    21
    FD ID and PA Fans
     

     
    bearing for each type of fan and motor
    1

     
    coupling for each type of fan
    1

     
    shaft sealing for each type of fan
    1

    22
    Fluidising Air Blowers
     

     
    Bearing
    1

     
    shaft sealing
    1

    23
    Flues and Ducts
     

     
    flange and expansion joint
    2

    3
    Air Heaters
     

     
    Cold end heating elements for air heater
    10

     
    radial and circumferential seals for one air heater
    100

     
    bearings (supports and guide) for one air heater
    1


    Item No
    Description
    Quantity per Item
    Remark
     
    motor drive for one air heater
    1

     
    bearings for ac motor drive
    1

     
    lubrication pump and relief valve
    1

    4
    Fuel Oil Pump
     

    41
    Strainers
     

     
    basket for each type
    2

    42
    Oil Pump
     

     
    sealing ring
    1

     
    Bearing
    1

     
    bushing wearing rings packing and gaskets
    2

     
    relief valve
    1

    5
    Chemical Dosing and Feedwater and Steam Sampling System
     

     
    pump membranes
    2

     
    stroke adjustment device
    1

    6
    Electrostatic Precipitators
     

     
    Insulator
    10

     
    tumbling hammer
    10

     
    Packing
    50

     
    fuse lamp
    50

    7
    Ash Handling System
     

    71
    Air Blower Compressors and Fans
     

     
    bearing
    2

     
    pulley if belt driven or flexible coupling if direct driven
    2

     
    Filters
    2

     
    heater module
    2


    Item No
    Description
    Quantity per Item
    Remark
     
    shaft and rotor
    1

     
    Gasket
    4

     
    oil seal
    2

     
    Impeller
    1

    72
    Bottom Ash Crusher
     

     
    grinding rollselement
    1

     
    Bearing
    1

     
    crusher shaft
    1

     
    seal plate and drip lips
    2

     
    Gaskets
    8

     
    reduction gear
    2

    73
    Ash Gate
     

     
    lacing door
    1

     
    access door
    1

     
    Seal
    1

    74
    Valves and Gates
     

     
    solenoid valves
    2

     
    relief valves
    1

     
    check valves
    1

     
    cut off gates
    1

     
    select valves for lines
    1

     
    vacuum valves
    1

     
    air intakes valves and spring
    1

     
    hydraulicpneumatic power cylinders for ash gates
    2

    75
    Pipe and Fittings
     

     
    bendelbow used
    10


    Item No
    Description
    Quantity per Item
    Remark
     
    pipes and joints used
    10

     
    Fitting
    10

     
    ejectors for mill pyrite hoppers (vertical mills)
    5

    76
    Others
     

     
    50 of liners of primary collectors
    50

     
    100 of filter elements of bag filter
    100

     
    50 of liners of mechanical collector
    50

     
    100 of each type and size of vent filters for ash silo
    100

     
    20 of each type and size of solenoid valves for bag filter
    20

     
    10 of each type and size of porous media for air slider
    10

     
    50 of lining pipe valves and bend for pH control system used
     50


    Consumables( Boiler and Auxiliaries)
    1
    Lubricating oil
    50kg

    2
    Lubricating grease
    50kg


    Miscellaneous and Others ( Boiler and Auxiliaries)
    1
    Boiler House Elevator and Service Hoists
    Bidder to recommend 

    2
    Vacuum Cleaning System
    Bidder to recommend  including one (1) set of bag filter

    3
    Nitrogen Gas Supply System
    Bidder to recommend 

    4
    pH Control System for Effluent
    Bidder to recommend 


    Item No
    Description
    Quantity per Item
    Remark
    5
    Other Pumps as Specified


    51
    bearing for each pump and motor
    1set

    52
    bushing wearing rings packing and gaskets for each pump
    2 sets


    Essential Maintenance Tools and Appliances( Boiler and Auxiliaries)
    1
    Special Tools
     


    Tools needed for reconditioning of seal of safety and power operated valves (flapping blocks grinding materials) The equipment shall be air operated and supplied with all necessary lapping plates
     


    all spanners wrenches screwdrivers pullers extractors torque etc to every item of plant supplied under this Volume All spanners wrenches torque wrenches etc are to be chromium plated
    1


    lifting slings beams upending devices eyebolts chain blocks etc including all equipment required to remove and replace rotor including temporary support structures All such equipment shall be tested prior to delivery and supplied with duplicate copies of the test certification
    1


    equipment required for withdrawing couplings bearings impellers glands etc
    1


    any special tools required during maintenance and cleaning of the Works including bridge gauges alignment jigs etc
    1


    equipment required for removing and replacing and plugging each type and size of heater tubes including tube expanding equipment
    1


    Furnace maintenance cradle with driving motor
    1


    Fiberscope complete with a camera attachment
    1


    Such additional materials tools tackle and equipment as the Bidder considers necessary
    1


    Item No
    Description
    Quantity per Item
    Remark

    Essential Spare Parts ( Coal Handling Plant )
    A
    Belt Conveyors
     

    1
    Oil seal
    1

    2
    Grease seal
    2

    3
    Tip for belt cleaner
    2

    4
    Rubber for UtypeU
    200

    5
    Rubber for skirt
    5

    6
    Carry idler rollers
    5

    7
    Return roller
    1

    8
    Impact roller
    20

    9
    Bearings
    1

    10
    Conveyor belts
    1000

    11
    Brake liner
    2

    12
    Gearboxes
    1

    B
    Stacker
     
    YY had accepted contractor’s alternative proposal on coal handling so spare parts of this part will be reconsidered and decided

    Item No
    Description
    Quantity per Item
    Remark



    during basic design period
    1
    Drive Unit
    1
    2
    Brake lining and disc
    1
    3
    ORings
    1
    4
    Oil Seal
    1
    5
    GreaseSeal
    1
    6
    Tip for belt cleaner
    1
    7
    Skirt rubber
    40
    8
    Carry idler rolls
    5
    9
    Impact roller
    5
    10
    Return roller
    5
    11
    Boom conveyor belt
    1
    12
    Bearings
    1
    13
    Hydraulic pump and motor
    1
    14
    Others
     
    C
    Reclaimer
     
    1
    Drive Unit
    1
    2
    Brake lining and disc
    1
    3
    ORings
    1
    4
    Oil Seal
    1
    5
    Grease Seal
    1
    6
    Bearings
    1
    7
    Hydraulic pump and motor
    1
    8
    Chain
    1
    9
    Sprocket and drive shafts
    1
    10
    Others
     
    D
    Belt Weigher
     

    1
    Bearing Scale
    1

    2
    Idlers
    20

    3
    Load Cells
    3

    E
    Sampling Equipment
     

    1
    Bearings
    1

    2
    Rollers
    1

    3
    Hammer or Impact plate for crushers
    1

    4
    Liners
    1

    5
    Vibrator
    1

    6
    Conveyor belt
    1

    7
    Others
     

    F
    Magnetic Separator
     

    G
    Water Spray Systems for Coal Storage Yard
     

    1
    Sprinkler Nozzles
    1

    2
    Motor Valves
    1

    3
    Others
     


    Item No
    Description
    Quantity per Item
    Remark
    H
    Cleaning Systems
     

    I
    Indoor Switchboard
     

    1
    Bushing insulators
    10

    2
    Stationary contacts
    10

    3
    Moving contacts
    10

    4
    Trip coils
    10

    5
    Closing coils
    10

    6
    Auxiliary contacts
    10

    7
    Auxiliary relay
    10

    8
    Springs
    10

    9
    Valves
    10

    10
    Main contacts
    10

    11
    Auxiliary contact
    10

    12
    Miniature circuit breaker
    10

    13
    Thermal relays
    10

    14
    Terminal blocks
    10

    15
    Lamp fittings and lens
    10

    16
    200 of lamp bulbs
    10

    17
    Pushbutton switches
    10

    G
    Auxiliary Power Transformer
     

    1
    bushings
    2

    2
    Thermometer
    1

    3
    winding temperature indicator
    1

    4
    auxiliary current transformer
    1

    5
    contacts and coils
    1

    K
    Battery and Charger
     


    Item No
    Description
    Quantity per Item
    Remark
    1
    spare cells drycharged with electrolyte
    10

    2
    electrolyte
    10

    3
    terminal connector
    10

    4
    pilot lamp bulbs
    200

    5
    fuses
    20

    6
    auxiliary relays
    20

    7
    relay
    1

    8
    thyristor
    100

    9
    printed circuit boards
    1

    10
    molded case circuit breaker
    1

    11
    terminal board
    2

    12
    changeover switch
    1

    L
    Lighting System
     

    1
    molded case circuit breaker
    20

    2
    electric bulb
    200

    3
    fuse
    20

    4
    lamps
    20

    M
    Cables
     

    1
    the installed length of each type and rating of cable used Each spare length shall be conditioned on a reel
    5

    2
    cable terminals and clamps used in cable termination
    5

    N
    Motors
     

    1
    bearing
    2

    2
    motor
    1





    O
    Other Electrical Parts
     


    Item No
    Description
    Quantity per Item
    Remark
    1
    normal use of carbon brush for torque motors
    200

    2
    normal use of brush for cable drum slip ring
    200

    3
    normal use of solenoid valve coil
    100

    4
    speed switch
    5

    5
    chute switch
    5

    6
    emergency switch
    5

    7
    Lanyard switches
    5

    8
    Blocked chute switches
    10

    9
    Belt Mistracking Switches
    4

    10
    Pulley Coal Built Up switches
    2

    11
    Take up Travel Limit Switches
    4

    12
    Tripper Travel Limit Switches
    4

    13
    Cable reeler
    1

    14
    Reclaimer and stacker travel proximity sensors
    8

    P
    Control and Instrumentation
     

    1
    including (not to be limited) 10 of number of sets of Printed Circuit Board (PCB) but not less than one (1) set for each type used other items according to the manufacturer’s recommendation In addition at least 10 of each type of spare modules including auxiliary relays shall be provided in each control cubicle and control cabinet or the case of the maintenance work
    1

    2
    These spare modules and auxiliary relays shall be suitably fitted in relevant cubicle and cabinets
    1

     
    Limestone Handling System
     

    1
    Indoor switchboard
    1

    2
    Auxiliary Power Transformer
    1

    3
    Battery and Charger
    1


    Item No
    Description
    Quantity per Item
    Remark
    4
    Lifting System
    1

    5
    Cables
    1

    6
    Motors
    1

    7
    Other electrical Works
    1


    Essential Maintenance Tools and Appliances ( Coal Handling Plant )

    1
    level switch assembly
    3

    2
    pressure switch
    5

    3
    assembly of level indicator
    2

    4
    flow switch
    5

    5
    temperature switch
    5

    6
    flow meter
    2

    7
    solenoid valve
    10

    8
    indicating instrument
    1

    9
    indicating meter
    1

    10
    diaphragm for each type of actuator for pneumatic control valve
    1

    11
    gland packing for each type of control valve
    5

    12
    power diodes for each type used in control systems
    20

    13
    transmitter
    1

    14
    Load cell of each type belt used
    2

    15
    3valve bypass manifold
    1

    16
    9point test recorder
    1

    17
    pressurehand pump for instrument calibration
    2

    18
    fittings
    300

    19
    installed length of tubing
    10


    Item No
    Description
    Quantity per Item
    Remark
    20
    Vulcanizing device for conveyor belts
    1

    21
    Jack for stacker and reclaimer
    2

    22
    Spanner wrenches screwdrivers pullers extractors torque wrenches etc to suit every item of plant
    1

    23
    Lifting slings beams upending devices eyebolts chain blocks etc including all equipment required to remove and replace any rotors including temporary support structures
    1

    24
    Any special tools required during maintenance and cleaning of the Works including bridge gauges alignment jigs etc
    1

    25
    Special Maintenance Tools
     

     
    special toolscalibration test instrumentprogram loader applicable for the following systems


     
    Stacker
    1

     
    Reclaimer and Bucket Wheel control system
    1

     
    Conveyor control system
    1

     
    Auto sampler system
    1

     
    Yard management computer
    1

     
    Coal yard spray control system
    1

     
    Others
    1

    26
    Control and Instrumentation
     

     
    Conveyor Control System
    1

     
    Coal Yard Spray Control System
    1

     
    Auto Sample System
    1

     
    Other Systems
    1

    27
    Limestone Handling System
     

     
    One set of all instruments such as spanners wrenches screwdrivers circuit to suit every item of plant shall be provided All these instruments are to be chromium plated
    1


    Item No
    Description
    Quantity per Item
    Remark
     
    One set of special tools required shall be equipped to maintenance and cleaning
    1

     
    Additional materials tools tackle and equipment which the Contractor considers necessary
    1


    Essential Spare Parts ( Control and Instrumentation System )
    A
     SCMS
     

    1
    Main Controller Unit Module
    8

    2
    Controller Rack
    5

    3
    IO Module Rack
    20

    4
    220VAC power distribution module 8CH
    3

    5
    24VDC Power module
    50

    6
    48VDC power module
    8

    7
    48VDC interrogation voltage distribution module
    5

    8
    8channel AI module
    35

    9
    AI terminal module
    35

    10
    8channel AI module Redundant
    8

    11
    AI terminal module redundant
    8

    12
    8channel RTD input module
    14

    13
    RTD input terminal module
    14

    14
    8channel TC input module
    8

    15
    TC input terminal module
    3

    16
    TC input terminal module with cold compensation
    3

    17
    8channel AO module
    6

    18
    AO terminal module
    6


    Item No
    Description
    Quantity per Item
    Remark
    19
    6channel AO module Redundant
    3

    20
    AO terminal module Redundant
    3

    21
    16ch DI module
    50

    22
    SOE terminal module
    3

    23
    Dry contact input terminal module
    53

    24
    8channel pulse input module
    3

    25
    Standard terminal module
    3

    26
    16channel transistor output module
    23

    27
    AC relay output teminal module
    20

    28
    DC relay output teminal module
    3

    29
    IDAS Module (intelligent DAS)
    3

    B
    UCMS
     

    1
    CCTV equipment
    1

    2
    Machinery Monitoring System
    1

    3
    Gas Monitoring Instrumentation
    1

    4
    Chemical Instrumentation
    1

    5
    One Operator Interface MMI system
    1

    C
    PLC system
     

    1
    each type of module ie communications module memoryCPU module controller gateway etc
    1

    2
    each type of IO module (with terminal strip) for each 50 modules supplied
    1

    3
    each type of specialised IC such as PROMS EPROMS communications cards and chips etc
    1

    4
    each type of system relay for each 100 or less used in the system
    4

    5
    discrete electronic and electromechanical components of the special or oneoff type
    1


    Item No
    Description
    Quantity per Item
    Remark
    6
    plugin replacement power supplies for each type based on one for every 5 power
    1

    7
    each type of fuse fuse holder miniature circuit breaker etc
    8

    8
    each type of LED
    30

    9
    each type of plug and socket
    1

    10
    field IO power supply equipment for every 5 supplied
    1

    11
    Standard rack complete with card rails for each system( 1pcs of IO rack for each type of rack)
    1

    12
    discrete electronic and electromechanical components of the special oneoff type eg EPROMS etc
    1

    13
    spare Operator Interface including keyboard processor VDU hard disk units etc including software for a fully functional operator Interface FOR EVERY 5 installed
    1

    14
    cooling air fans of each type used for PLC control system cubicle cooling (if used)
    3


    Consumables ( Control and Instrumentation System )
    1
    The Bidder shall list all consumable spare parts and supplies required for two year's continuous satisfactory operation of all equipment supplied under the Contract Consumable Spares shall include but not be limited to floppy disks streaming tapes CDROM’s DVD’s and optical disks
    1

    2
    The total cost of the consumable spares shall be stated separately in Schedule in Part D for each control system and shall be included in the total Bid price
    1


    Essential Maintenance Tools and Appliances ( Control and Instrumentation System )
     
    Specialised Maintenance Tools and Test Equipment


    1
    a portable notebook PC control system programmer etc
    1


    Item No
    Description
    Quantity per Item
    Remark
    2
    online and offline diagnostic software packages available for each control system
    1

    3
    a separate test and development system
    1

    4
    software loaded laptop
    1

    5
    hart communicator
    1

    6
    cablirator
    1


    Essential Spare Parts ( Electrical Works )
    A
    Generator
     

    1
    generator set of shaft journal bearings comprising top and bottom halves complete with bolts nuts and lockwashers
    1

    2
    generator set of bearing and pedestal insulation
    1

    3
    turbogenerator set of shaft earthing and voltage sensing brushes
    1

    4
    Sufficient top and bottom Included stator winding bars to repair a fault in the worst location supply to include all associated items necessary to effect the repair including hoses fittings wedges packers
     

    5
    Turbogenerator set of generator access door and shield gaskets
    1

    6
    Turbogenerator set of brush gear including arms brush boxes springs
    1

    7
    generator set of sliprings


    8
    generator terminal bushing
    1

    B
    Excitation System
     

    1
    Of each type of automatic excitation controller printed circuit card
    1

    2
    Number of thyristor units equivalent to the amount of redundancy in one arm of a thyristor bridge refer to Volume 2 each unit consisting of the valve and associated control and protection components
     


    Item No
    Description
    Quantity per Item
    Remark
    3
    thyristor bridge cooling fanmotor unit
    1

    4
    field circuit breaker set auxiliary contacts
    1

    5
    field circuit breaker set arcing tips
    1

    6
    field circuit breaker set suppression resistors
    1

    7
    field circuit breaker set closing and trip coils
    1

    C
    Hydrogen Cooling System
     

    1
    Hydrogen CCW Cooler
     

    (1)
    5 of the cooling tubes
     

    (2)
    Tube plugs of number equivalent to 10 of the total number of tubes
     

    (3)
    sets gaskets for the manholes and water boxes
    4

    (4)
    sets of special gaskets for each heat exchanger
    4

    2
    Valves and Fittings
     

    (1)
    valves of each type and size
    2

    (2)
    sets of renewable parts of valves for each type and size
    2

    (3)
    of sight flow indicator installed
     

    (4)
    set of filter basket for each type
    1

    D
    Seal Oil System
     

    1
    Seal Oil Pumps
     

    (1)
    set of bearings for each pump
    1

    (2)
    set of wearing rings and bushes
    1

    (3)
    sets of packing and special gaskets for each pump
    2

    2
    Seal Oil Cooler
     

    (1)
    5 of the cooling tubes
     

    (2)
    Tube plugs of number equivalent to 10 of the total number of tubes
     


    Item No
    Description
    Quantity per Item
    Remark
    (3)
    sets gaskets for the manholes and water boxes
    4

    (4)
    sets of special gaskets for each heat exchanger
    4

    3
    Valves and Fittings
     

    (1)
    valves of each type and size
    2

    (2)
    sets of renewable parts of valves for each type and size
    2

    (3)
    of sight flow indicator installed
     

    (4)
    set of filter basket for each type
    1

    E
    Medium (66kV) and Low (400V) voltage system
     

    1
    66kV and 400 V circuit breaker of each type and rating
    1

    2
    66kV switching device of each type and rating
    1

    3
    66kV motor of each type and rating
    1

    4
    actuator of each typefunctionrating
    1

    5
    The 400V switchboards shall be designed to incorporate 10 more circuits than the number specifically identified as being required for the plantSpare circuits shall be fully equipped wired and tested with all electrical equipment other than current transformers Spare circuit ratings shall include the complete range of ratings used for plant operation but shall comprise mostly lower rated rather than higher rated circuitsThe ratings and numbers chosen shall be subject to agreement with THE OWNER
    1

    6
    transformer bushing of each type and rating
    1

    F
    Control Devices
     

    1
    fuses of each type and rating
    6

    2
    TRIP coils and four CLOSE coils of each type and rating
    4

    3
    control relays of each type and rating
    4

    G
    Cables
     

     
    One steel drum (wooden drums are not acceptable for spares usage) containing 250 metres of each type of 66kV cable A separate steel drum shall be provided for each cable size
    1


    Item No
    Description
    Quantity per Item
    Remark
    H
    High Voltage Switchyard system
     

     
    High Voltage Switchgear
     

    1
    Circuit Breakers
     

    (1)
    Interruptor 1 phase1
    3

    (2)
    Support columns
    3

    (3)
    Capacitors 1 phase
    3

    (4)
    Auxiliary Interruptor
    3

    (5)
    Insulators
    1

    (6)
    Operating rod
    1

    (7)
    Contacts 1 phase
    3

    (8)
    Tripclose coils
    10

    (9)
    Auxiliary switches
    2

    (10)
    Relayscontacts
    2

    (11)
    Operating Springs
    1

    (12)
    Operating mechanism
    1

    (13)
    Accumulator 3 phase
    3

    (14)
    Hydraulic valves
    2

    (15)
    Pressure switches
    2

    (16)
    Motors
    2

    (17)
    Drive linkage
    1

    (18)
    Desiccant
    2

    2
    Current Transformers
     

     
    CT Post
    3

    3
    Voltage Transformers
     


    Item No
    Description
    Quantity per Item
    Remark
     
    VT Post
    3

    4
    Disconnectors
     

     
    Fixedmoving contacts 3 phase
    2

     
    Motor
    1

     
    Auxiliary switches
    2

     
    Relayscontacts
    2

    5
    Earth Switches
     

     
    Fixedmoving contacts 3 phase
    2

     
    Auxiliary switches
    2

    6
    Insulators


     
    Post
     3

    7
    Surge Arrestors
    1

     
    Protection Systems
     

    I
    Electrical Works
     

    1
    Disc Insulators
     

     
    220kV String
    1

    2
    Conductor Clamps Fittings
    6

    3
    ACSR Conductor (Each size)
    100

    4
    Kiosk and Panel Equipment
     

     
    Terminal Blocks fuses links cable glands etc
    10

     
    Auxiliary relays etc each type
    5

    5
    220 V Batteries
     

     
    Cells
    20

    6
    Battery Chargers
     

     
    Printed Circuit Boards – complete replacement set (Mother Board not included)
    1


    Item No
    Description
    Quantity per Item
    Remark
     
    Main Diode complete replacement set
    1

     
    Thyristor complete replacement set
    1

    7
    dc Distribution Boards
     

     
    Relays each type
    1

     
    Fuses each type
    10

    8
    ac Distribution Boards
     

     
    Contactor contacts – set
    3

     
    Contactor coil
    1

     
    Circuit Breakers each type and rating
    1

    J
    Communication system
     

    1
    Technical Services
     

     
    power supplies and printed circuit cards
    10

     
    parts to enable a faulty subunit to be repaired in a central workshop
    5

    2
    Radio Paging UHF Radio and Emergency Warning Systems
     

     
    Radio paging system
     

     
    Pagers vibrating type unit
    2

     
    Pagers audible type
    3

     
    UHF Radio System
     

     
    Radios handheld mobile
    1

     
    Radios fixed unit
    1

     
    Emergency Warning System
     

     
    power supplies printed circuit cards microphones speakers etc
    10

     
    Component parts to enable a faulty subunit to be repaired in a workshop
    5



    Item No
    Description
    Quantity per Item
    Remark
    Consumables ( Electrical Works )
    A
    High Voltage Switchyard system
     

    1
    Insulation oil – litres
    1000

    2
    SF6 gas 42 kg cylinder
    1

    3
    SF6 gas cylinder 42 kg empty
    1

    4
    Seals – sets
    2

    5
    Grease each type litres
    10

    6
    Lubricating oil each type litres
    100

    7
    Fuse cartridges each type
    10

    8
    Lamps each type
    10

    B
    Generator Circuit Breaker Scheme (GCB)
    Consumable spares which will require replacement at intervals of less than 24 months will be provided as part of the Contract and the price included in the Bid Document The consumable spares will be sufficient for one year's normal usage where an item is not listed in the appropriate schedule and requires replacement in less than 24 months from the date of Practical Completion



    Essential Maintenance Tools and Appliances ( Electrical Works )
    1
    Generator
     

     
    apparatus to maintain a breathable atmosphere inside the generator during personnel access via manholes and to prevent the condensation of moisture within the generator when the generator is degassed but not otherwise open to atmosphere A description of the proposed apparatus shall be included in the Bid Documents
    1

    2
    Generator Circuit Breaker Scheme (GCB)
     

     
    One complete set of all SPECIAL spanners tools and appliances including special slings and lifting equipment necessary for maintaining the whole of the plant including that plant supplied by Subcontractors shall be provided The spanners and tools supplied under this Clause shall be new and shall not be used during the erection of the plant A list of such spanners tools and appliances shall be given in the appropriate Schedule of the Specification
    1


    Item No
    Description
    Quantity per Item
    Remark
     
    The spanners shall include two spanners to fit the nuts of all bolts 25 mm diameter and over Grease guns spanners and tools which are of a size and type which could be reasonably expected to be readily available to tradesmen are not required to be provided under this Clause
    1



    APPENDIX 11 LIST OF IMPORTED ITEMS
    附件11 进口货物清单

    This list of imported items will be submitted by WWW to xx for review at least six (6) months before the first equipment arrives to the site
    进口货物清单少第批设备达现场前6月提交xx检查
    Additional Attachment to No8 of Appendix 12
    Costs of Coal Consumption during Duration of Reliability Run

    Item
    YY’ Requirments
    Bidder’s Proposal
    Conclusion

    No 8 Appendix 12 – Limits of Supply

    Coal for commissioning up to Provisional Acceptance (Commercial operation by YY) will be paid by Contractor and included into total commissioning and test cost

    Coal for 30 days of Reliability Run will be provided by YY at his own expense
    Coal Costs for 30 days of Reliability Run will be deducted from Bid Price
    Add to No8 of Appendix 12

    YY agrees to provide sufficient coal for 30 days of Reliability Run for each unit at his own expenses providing that
    1 The Reliability Run will follow the time period load factor and coal consumption which are specified in the attached Table A The actual time schedule and load factor will be aprroved by Owner before Reliability Run




    2 In case Reliability Run is not successful andor in excess of 30 days (not including 72 hours extension for Plant shutdown if any) andor in excess of coal consumption of 145074 tons Contractor has to incur all arising expenses according to market price
    3 Coal costs of 91584554122VND for Reliability Run shall be deducted from the Contractor’s Bid Price (ie The final Contract Price shall exclude costs of coal for Realibility Run)

    (details refer to the following Table A)



    文档香网(httpswwwxiangdangnet)户传

    《香当网》用户分享的内容,不代表《香当网》观点或立场,请自行判断内容的真实性和可靠性!
    该内容是文档的文本内容,更好的格式请下载文档

    下载文档到电脑,查找使用更方便

    文档的实际排版效果,会与网站的显示效果略有不同!!

    需要 10 香币 [ 分享文档获得香币 ]

    下载文档

    相关文档

    工程总承包合同示范文本-EPC

     工 程 总 承 包 合 同 发包人(全称) 承包人...

    7年前   
    9912    1

    国际工程承包合同工程总承包合同2

    国际工程承包合同(2) (一)工程总承包合同 A国的一家业主和B国的一家国际建筑工程承包公司之间,就在A国的一座学校的施工建设,签订了工程承包合同。现将合同全文介绍如下: ...

    15年前   
    23377    0

    建设工程总承包EPC建设工程项目管理方案

     工程总承包EPC建设工程项目管理方案 目 录 第一章 建...

    5年前   
    2007    1

    EPC施工总包合同

    (以下简称本工程)是由甲方投资开发建设,经过招投标,现确定由乙方承建。为进一步明确甲乙双方的责任、权利、义务,保证工程顺利实施,经甲乙双方友好协商,按照《中华人民共和国合同法》、建筑法及 ...

    2年前   
    564    0

    国际工程承包合同(3)-工程总承包合同

    国际工程承包合同(3) 工程总承包合同 日期:19__年__月__日   地点______市   本合同经下述双方签署:   1 ____市卫生局局长____先...

    13年前   
    13827    0

    国际工程承包合同工程总承包合同

    国际工程承包合同(3) 工程总承包合同 日期:19__年__月__日   地点______市   本合同经下述双方签署:   1 ____市卫生局局长____先...

    13年前   
    29873    0

    EPC工程总承包资料管理制度

     EPC工程总承包资料管理制度 一、目的 为确保项目信息的收集整理、分析处理、上传下达、分类归档进而项目信息最终以各类文件的形式存在,来进行归档存储。防止使用文件出现偏差或者遗失,对文件要...

    10年前   
    9951    1

    老尖山风电工程总承包(EPC)项目实施方案

    云南大姚老尖山风电工程EPC总 承 包 实 施 方 案中国水电参谋中国电建集团中南勘测设计研究院云南老尖山风电场工程总承包工程部集团中南勘测设计研究院云南老尖山风电场工程总承包工程部20212...

    2年前   
    364    0

    建设工程总承包合同

    建设工程总承包合同  协议书  发包人(全称):___________有限公司  承包人(全称):___________集团有限责任公司  依照《中华人民共和国合同法》、《中华人民共和国建筑法...

    12年前   
    615    0

    建筑工程总承包合同

    建筑工程总承包合同  日期: 19__年__月__日  地点______市  本合同经下述双方签署:  1 ____市卫生局局长____先生(以下简称甲方)  2 建筑工程承包公司海外工程部经...

    10年前   
    656    0

    太阳能光伏发电站EPC总承包合同协议

    双方就 光伏电站EPC总承包工作协商一致,根据《中华人民共和国合同法》的约定,达成如下协议,并由双方共同恪守。

    2年前   
    562    0

    国际工程承包合同工程总承包合同3

    国际工程承包合同(1) 第一部分 一般条款定义 第一条 (一)在合同中,除合同内容另有要求外,下列词定义如下:   (1)“业主”,名称将在第二部分中具体标明,指雇用承...

    7年前   
    9831    0

    火电厂建设程序2

      火电厂建设程序 ㈠、初步可行性研究 对拟建工程项目的建设必要性、技术可行性与经济合理性进行初步研究,提出初步评价,以便确定工程建设项目能否成立的工作。初步可行性研究报告经审查同意后即...

    5年前   
    735    0

    EPC工程的索赔真经

    EPC工程的索赔真经  在当前全球金融危机影响下,全球水泥市场需求萎缩,投资减少,市场利润空间变窄,市场竞争形势更为严峻,业主违约风险加大,一旦业主违约,势必引起承包商建设成本和履约风险的增加...

    8年前   
    507    0

    国外展会小结2篇

    国外展会小结2篇  1.国外展会选择要选好市场,像抵制中国货或者是局势动荡的地方如俄罗斯 请慎重选择。  2.如果参加国外展会请慎重选择组展公司和展品运输公司。  3.如果有展品需要运输,与组...

    9年前   
    627    0

    建设工程承包合同(2)

    建设工程承包合同(2) 发包方:_____   承包方:_____   上述双方经过友好协商,共同达成如下合同条款:               第一章 合同一般规范 ...

    11年前   
    23974    0

    国际工程承包合同(2)

    国际工程承包合同(2) (一)工程总承包合同 A国的一家业主和B国的一家国际建筑工程承包公司之间,就在A国的一座学校的施工建设,签订了工程承包合同。现将合同全文介绍如下: ...

    10年前   
    6280    0

    设计总承包合同

    XXXXX(室内精装修) 设 计 总 承 包 合 同 第一部分 建设工程设计总承包合同协议书 委托方: 承包方: 委托方与承包方经双方协商一致...

    12年前   
    7017    0

    2017年建筑工程总承包合同格式

    建筑工程总承包合同格式  总承包方: (以下简称甲方)  分包方: (以下简称乙方)  建设方决定将总承包方承建的 工程其中的 为保证整体工程的顺利完成,经双方协商,达成以下协议:  第一条 ...

    6年前   
    516    0

    总承包合同下工程风险与索赔

    总承包合同下工程风险与索赔  建设工程施工合同即建筑安装工程承包合同,是发包人与承包人之间为完成商定的建设工程项目,确定双方权利和义务的协议。  一项工程合同,具体指导一项工程如何操作完成,是...

    12年前   
    397    0

    文档贡献者

    z***u

    贡献于2019-03-13

    下载需要 10 香币 [香币充值 ]
    亲,您也可以通过 分享原创文档 来获得香币奖励!
    下载文档