香当网——在线文档分享与服务平台

您在香当网中找到 1859个资源

P4

 PPP 项目建设期绩效考核实施办法

1 ****PPP 项目建设期绩效考核实施办法 第一章 总则 第一条 为建立项目建设期绩效考核体系与约束机制,充分 调动各方参与建设工作的积极性,切实提高投资效益,维护各方 权益,充分遵循“客观、公平、公开、公正、适度”的原则,把

2019-10-11    4678    0
P555

 HP Prime用户指南

HP Prime 绘图计算器 用户指南 第 1 版 部件编号 NW280-2AA1法律声明 本手册及其所包含的所有示例均按 “原样”提供,如有更改,恕不另行通知。 Hewlett-Packard Company

2019-09-05    6347    0
P62

 知乎运营最全指南

随用户的行为累积计算,每周更新一次。 知乎盐值从「基础信用」、「内容创作」、「友善互动」、「遵守规范」、「社区 建设」五个维度进行综合计算,每个维度的指数计算原理,可看: https://www.zhihu.com/term/credit

2020-04-16    5990    1
P78

 Choice金融终端使用指南

choiceinfo@原链接已经失效或不安全 http://choice.原链接已经失效或不安全 Choice 金融终端使用指南 —— DATA TALKS , WE TRANSLATE —— 东方财富信息股份有限公司 2 目录

2019-03-21    8291    0
P72

 2013管理指南动脉高血压

The Task Force for the management of arterial hypertension of theEuropean Society of Hypertension (ESH) and of the European Societyof Cardiology (ESC)

2020-01-08    5918    0
P137

 TIA_Portal_V13_入门指南

___________________ ___________________ SIMATIC S7-1500 入门指南 06/2014 A5E03981765-AC 欢迎 自动化任务 1 硬件部分 2 软件部分 3 安全性

2020-03-16    2134    1
P8

 关于党支部建设提升工程的实施方案

关于党支部建设提升工程的实施方案 为深入贯彻落实新时代党的建设总要求,推动基层党 组织建设全面进步、全部过硬,进一步提升公安机关党建 工作质量和水平,根据《中国共产党支部工作条例(试 行)》和上级党组织的相关要求,结合市局实际,决定在

2020-08-28    5657    0
P126

 XX设施农业基地(拱棚)建设项目实施方案(代可行性研究)

第十四师昆玉市二二四团设施农业基地 (拱棚)建设项目 实施方案(代可研) (送审稿) 和田大漠田园农业发展有限公司 新疆兵团勘测设计院(集团)有限责任公司 农业工程设计甲级 A165000186 编制日期:二零一八年七月

2019-01-19    4246    0
P572

 《项目管理知识体系指南》PMBOK_第五版-中文版 非扫描版

Institute.《项目管理知识体系指南》(PMBOK®指南)(第 5 版) 1 1 第 1 章 引论 《项目管理知识体系指南》(PMBOK®指南)第 5 版为管理单个项目提供指导,对项目管 理相关概念进

2019-04-08    2835    0
P133

 XX市西城经济产业综合提升PPP项目实施方案

ਨޜഭؑᤋḷ䳶ഒ㛑ԭᴹ䲀 ᇎ ᯭ ᯩ Ṹ ሯሯݹᐲ㾯෾㓿⍾ӗъ㔬ਸᨀॷ 333 亩ⴞ ,I 目 录 第一章 项目概况...............................................

2018-12-27    6435    0
P100

 91钢与奥氏体钢焊接指南-EPRI

PRIMARY AUDIENCE: Research engineersSECONDARY AUDIENCE: Plant, corporate, and design engineersKEY RESEARCH QUESTIONThere is limited information in the open literature regarding the fabrication and performance of dissimilar metalwelds (DMWs) between 9%Cr creep-strength-enhanced ferritic (CSEF) steel and austenitic stainless steelcomponents. Furthermore, the results from the available studies have not established the factors thatcontribute to the fusion line cracking reported for some in-service failures. This report provides examples ofindustry failures in several end-use components and links them to the key contributions from design,operation, fabrication, and metallurgy of DMWs.RESEARCH OVERVIEWThis report provides important guidelines regarding the design, fabrication, and construction of DMWsbetween 9%Cr CSEF steel and austenitic stainless steel components that are designed to transport or collectsteam. This report does not address details specific to the following: overlay welding, such as for corrosionresistance; repair welding, such as might be addressed by the American Society of Mechanical Engineers(ASME) Post Construction Code or the National Board Inspection Code; prescriptive guidance, including howto use particular welding processes; or qualification guidelines addressed by the ASME Boiler and PressureVessel Code, Section IX. Numerous practical considerations exist regarding the specification and fabricationof DMWs, and it is not possible to address all potential concerns regarding this type of connection in thisreport. Instead, this report provides basic guidelines that are important to the goal of promoting “better”practice and providing equipment owners and operators with information to consider regarding additionalrequirements that are relevant to purchasing specifications. Specific factors that affect performance in thecontext of design, fabrication, operation, and metallurgical risk are addressed.KEY FINDINGSThe summary of recommendations in this report provides a concise set of guidelines regarding key aspectsof DMW construction, including restrictions on the end-use application, weld joint geometry, welding process,post-weld heat treatment, transition pieces, operation, and special considerations.WHY THIS MATTERSEvery steam-raising power boiler in a power generating plant is made with a range of different steels. Thepressure boundary joints necessitate welding of the steels. Despite the number of joints that exist, there hasnot been an extensive evaluation of fabrication factors that affect performance in cross-weld creep for DMWsconstructed between 9%Cr CSEF steel and austenitic stainless steel components. This report provides insightinto the factors that contribute to performance with respect to when a weldment fails and how it fails (that is,damage tolerance).9842144EX

2019-02-24    3833    0
P9

 Optima_CT660_场地准备快速指南

5368510-1EN R2 Optima CT660 场地准备快速指南 GE 梦想启动未来 g GE 梦想启动未来 Optima CT660 场地准备快速指南 第 2 页 前 言 尊敬的客户: 感谢您选择了 GE

2020-01-03    1841    0
P30

 房地产投资岗从业指南

从业指南 投资拓展岗房地产目录 1、房地产投资岗的主要工作 2、土地获取的基本流程及方式 3、房地产投资测算的基本逻辑 4、房地产投资岗所需专业能力及素质 5、房地产投资岗职业发展路径 6、房地产投资岗知识清单建议

2020-04-15    2669    0
P108

 三级医院诊疗服务能力指南

三级综合医院医疗服务能力指南 (2016 年版) 编写说明 为贯彻落实十八届三中、四中、五中全会精神,根据《国务 院办公厅关于推进分级诊疗制度建设的指导意见(国办发〔2015〕 70 号)》要求,国家卫生计生委组织专家制定了《三级综合医院

2018-12-26    3513    0
P57

 2018年一一级建造师建设工程项目管理

2018一级建造师 建设工程项目管理1、考试时间 考试日期 考试时间 考试科目 9月15日 9:00 - 11:00 工程经济 14:00—17:00 法规 9月16日 9:00 - 12:00 施工管理

2019-03-16    2517    0
P21

 建设项目环境影响评价分类管理名录

2 — 建设项目环境影响评价分类管理名录 第一条 为了实施建设项目环境影响评价分类管理,根据《环 境影响评价法》第十六条的规定,制定本名录。 第二条 国家根据建设项目对环境的影响程度,对建设项目的 环境影响评价实行分类管理。

2019-04-08    4725    0
P41

 XX山泉水厂建设项目环评报告

建设项目环境影响报告表 项目名称: 贵州剑河苗源山泉水厂建设项目 建设单位(盖章): 贵州剑河苗源山泉有限责任公司 编制日期:2017 年 2 月 国 家 环 保 部 制1 建设项目基本情况 项目名称

2019-11-30    4625    0
P17

 建设1100kV 100 kA试验系统项目可行性分析报告

建设 1100kV 100 kA 试验系统 项目可行性分析报告 苏州电器科学研究院股份有限公司 二 0 一二年三月 目 录 一、项目背景与意义 ............................

2019-06-25    2084    0
P2

 国有企业参与PPP项目建设和运营的思考

53 国有企业参与 PPP 项目建设和运营的思考 温来成 理方法和手段。国有企业长期从事基础 设施建设和运营,熟悉和了解本行业企 业的运营规律、管理特点,在参与PPP 项目建设运营后,可以充分发挥其行业

2018-12-25    3617    0
P74

 湖州市海绵城市建设实施导则

湖州市海绵城市建设实施导则 (试行) 湖州市住房和城乡建设局 2016 年 11 月 目 录 前 言..................................................

2019-05-31    2411    0
1 2 3 4 5 ... 50